Past Works |
| |
|
(01) JDTPS
Year
1997-2000 and 2004-2007
Evacuation of Ash from different
filled up ash ponds of Durgapur Thermal Power
Station, Damodar Valley Corporation, Waria,
Nuisance-free transportation and disposal of ash
in abandoned mines of ECL at Ghanashyam etc.
Quantity: 25,40,000 M3.
(02) MTPS
|
 |
|
| |
- Year 1998-99
Deployment of Dozers with earth cutting blade/coal blade
attachment for dozing/dressing of coal in MTPS Coalyard.
Total running hours 8200 Hrs.
- Year 2002
Deployment of Dozers in the Coal Yard of MTPS for
dozing/dressing of coal in Coal Yard & feeding coal to
Reclaim Hopper No.1 & 2 of CHP at MTPS. Quantity in
Hrs.: 10,223.104 Hrs.
- Year 2004
Deployment of Pay-Loader and Dumper in the Coal Yard of
MTPS for feeding R/H No.1 & RH No.2 Coal Handling Plant,
Mejia TPS, Damodar Valley Corporation, Durlavpur(Bankura)
W.B. Quantity: 719613.418 Mte.
- Year 2004-05
Supply, loading unloading & spreading of stone ballast
along the railway track by BOB-YN type of Railway, wagon
from Pacer Quarry site for Damodar Valley Corporation
Railway. Siding (Raniganj to MTPS Connection) of MTPS.
Total Quantity 9000 Cubic Metre.
- Year 2004-2007
Round the clock shifting of Coal (ROM/Middling by Pay
loader/Dumper from RAW Coal Yard/Crushed Coal yard. The
distance between Raw Coal Yard/Crushed Coal Yard to
Reclaim Hopper – 1 & 2 being 01 K.M. Quantity 2,00,000
Million Tonne per year.
- Year 2005
Loading, Transportation of Coal from Collieries of ECL
to MTPS Coal Yard by road with Truck/Dumper and
unloading for a period of 1 year. Quantity: 35,000 MT
per month.
- Year 2005-2006
Loading, Transportation of Coal from Collieries/Washeries
of BCCL to MTPS Coal Yard by road with Truck/Dumper and
unloading for a period of 1 year. Quantity: 15,000 MT
per month.
(03) CTPS
Dozer for the deployment at CHP for augmenting supply of
crushed Coal into Bunker.
|
| |
|